Assignment 4 – Project Process
Note: The assignments are a series of papers
that are based on the same case. The assignments are dependent upon one another
During the project
life cycle, project risk reviews and reports are required as previously
identified in the risk management plan. Two months after the project started,
the following events have taken place:
1. The top-two (2)
threats have occurred.
2. The top opportunity has been
realized.
3. The project’s risk budget is
already exhausted.
4. The risk
management schedule has been shortened by two (2) months.
Write a five to seven
(5-7) pages spaper in which you:
1.
Analyze the impact of
those events on the project.
2.
Determine if any
mitigation activities are required and explain why.
3.
Determine if budget /
schedule changes are necessary and explain why.
4.
Update the risk
register and highlight the changes made. Provide the justification for the
changes.
5.
Use at least four (4)
quality resources in this assignment.
Note: Wikipedia and similar Websites do
not qualify as quality resources.
Your assignment must
follow these formatting requirements:
- Be typed, double spaced, using Times New Roman font
(size 12), with one-inch margins on all sides.
- Include a cover page containing the title of the
assignment, the student’s name, the professor’s name, the course title,
and the date. The cover page and the reference page are not included in
the required assignment page length.