BUS 519 Assignment 4
Project Progress – EQI in SIWA
Due Week 9 and worth 200 points
Note: The assignments are a series of papers that
are based on the same case, which is located in the Student Center of the
course shell. The assignments are dependent upon one another.
During the project life cycle, project risk
reviews and reports are required as previously identified in the risk
management plan. Two months after the project started, the following events
have taken place.
1.
The top-two (2)
threats have occurred.
2.
The top opportunity
has been realized.
3.
The project’s risk
budget is already exhausted.
4.
The risk management
schedule has been shortened by two (2) months.
Write a five to seven (5-7) page paper in
which you:
1.
Analyze the impact of
those events on the project.
2.
Determine if any
mitigation activities are required and explain why.
3.
Determine if budget /
schedule changes are necessary and explain why.
4.
Update the risk
register and highlight the changes made. Provide the justification for the
changes.
5.
Use at least four (4)
quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify
as quality resources.
Your assignment must follow these formatting
requirements:
- Be typed, double spaced, using Times New Roman font
(size 12), with one-inch margins on all sides.
- Include a cover page containing the title of the
assignment, the student’s name, the professor’s name, the course
title, and the date. The cover page and the reference page are not
included in the required assignment page length.
The specific course learning outcomes
associated with this assignment are:
- Given an information requirement related to project
risk management, determine the nature and extent of information needed to
effectively address the topic; efficiently locate, determine the validity,
and critically evaluate the resources; and apply the information to
accomplish the specific purpose (report, case analysis, factual
requirement, problem solving, and planning).
- Use technology and information resources to research
issues in project risk management.
- Write clearly and concisely about project risk
management using proper writing mechanics.