BSOP 429 PRODUCTION ACTIVITY CONTROL AND JUST-IN-TIME WITH LAB – FULL COURSE
To Download tutorial
Copy and Paste below Link into your Browser
for any inquiry email
us at ( essayblue@gmail.com )
BSOP 429 Production
Activity Control and Just-in-Time with Lab – Full Course
BSOP 429 Week 1 Written Assignment
BSOP 429 Week 1 Discussion 1 How Other Levels
of OPC Affect PAC (graded)
BSOP 429 Week 1 Discussion 2 Compare and
Contrast JIT and MRP (graded)
BSOP 429 Week 2 Written Assignment
BSOP 429 Week 2 Lab 1 of 6: The
Scheduling Lab
BSOP 429 Week 2 Discussion 1 Lead Times
(graded)
BSOP 429 Week 2 Discussion 2 Lab 1 Discussion
(graded)
Q & A Forum for your questions and
comments (not graded)
BSOP 429 Week 3 Written Assignment
BSOP 429 Week 3 Lab 2 of 6; Lab Scheduling
BSOP 429 Week 3 Discussion 1 Types of
Constraints (graded)
BSOP 429 Week 3 Discussion 2 Lab 2 Discussion
(graded)
BSOP 429 Week 4 Written Assignment
BSOP 429 Week 4 Lab 3 of 6; Scheduling,
Reporting and Feedback
BSOP 429 Week 4 Discussion 1 PAC Feedback
(graded)
BSOP 429 Week 4 Discussion 2 Lab 3 Discussion
(graded)
BSOP 429 Week 4
Midterm Exam (2 Versions)
BSOP 429 Week 4
Midterm – Set 1
- (TCO 12) _____ is the objective under JIT and time-based
competition. (Points : 5)
- (TCO 2) Which of the following lead-time elements can be
compressed into one well-designed PAC system? (Points : 5)
- (TCO 3) What happens to inventory as the number of kanban cards
increases? (Points : 5)
- (TCO 1) In managing supplier relations, which of the following
is a beneficial setup? (Points : 5)
- (TCO 6) When linking marketing requirements and manufacturing
strategy, what design approaches for shop floor system should be
considered? (Points : 5)
- (TCO 9) Which of the following is true? (Points : 5)
- (TCO 4) According to Elyahu Goldratt, the TOC system uses a
scheduling approach called _____. (Points : 5)
- (TCO 5) The amount of time covered by the basic MRP record is
called the _____. (Points : 5)
Page 2
- (TCO 1) Please explain PAC. (Points : 20)
- (TCO 2) How does input from other areas into PAC and the
feedback PAC provides impact PAC? Explain. (Points : 20)
- (TCO 6) Discuss the differences between MRP and JIT. (Points :
20)
BSOP 429 Week 4
Midterm – Set 2
- (TCO 12) Formal systems for shop floor control under JIT are
_____.
- (TCO 2) An operation setback chart _____.
- (TCO 3) In order to minimize the number of orders waiting in
the queue and maximize the number of orders processed in a center, which
of the following rules should be used?
- (TCO 1) Which of the following is true?
- (TCO 6) When linking marketing requirements and manufacturing
strategy, what design approaches for shop floor system should be
considered?
- (TCO 9) Which of the following is true?
- (TCO 4) How much of total lead time is accounted for by queue
time?
- (TCO 5) Gross requirements in an MRP record are _____ because
they are stated as unique items for a given period.
Essay Type
- (TCO 1) List and briefly discuss the five main parts of the
operations planning control (OPC) system.
- (TCO 2) What information should be provided into PAC as
feedback and why they are important?
- (TCO 6) Compare and contrast JIT and MRP.
BSOP 429 Week 5 Written Assignment
BSOP 429 Week 5 Lab 4 of 6; JIT and PAC
BSOP 429 Week 5 Discussion 1 Reducing the Wall
of Inventory (graded)
BSOP 429 Week 5 Discussion 2 Lab 4 Assignment
(graded)
BSOP 429 Week 6 Written Assignment
BSOP 429 Week 6 Lab 5 of 6
BSOP 429 Week 6 Discussion 1 Supply Chain for
JIT Operations (graded)
BSOP 429 Week 6 Discussion 2 (Lab 5
Assignment) (graded)
BSOP 429 Week 7 Written Assignment
BSOP 429 Week 7 Lab 6 of 6; Critical Path
Method
BSOP 429 Week 7 Discussion 1 Implementation
(graded)
BSOP 429 Week 7 Discussion 2 Lab 6 Assignment
(graded)
BSOP 429 Week 8 Final
Exam
- (TCO 4) The priority rule, which will sequence jobs in the order
they are received, is _____. (Points : 5)
- (TCO 2) In an assignment method problem, if it takes Abe 3
hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4
hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost
(in hours) of assigning Betty to build the doghouse? (Points : 5)
- (TCO 2) A major difference between manufacturing and service
systems in terms of scheduling is (Points : 5)
- (TCO 3) Scheduling in service systems may involve scheduling
which of the following?
- (Points : 5)
- (TCO 5) The owner and operator of the local franchise of
Handyman, Inc., has four jobs to do today, shown in the order they were
received:
- (TCO 6) Building up an inventory of standard parts or modules
instead of immediately producing the finished end items is the essence of
(Points : 5)
- (TCO 7) With regard to suppliers, JIT systems typically require
(Points : 5)
- (TCO 10) Which of the following is characteristic of the JIT
philosophy? (Points : 5)
- (TCO 1) In make-to-stock systems, fluctuations in sales volume
are managed through which of the following? (Points : 5)
- (TCO 5) In an MRP master schedule, the planning horizon is
often separated into a series of times periods called (Points : 5)
Page 2
- (TCO 8) Explain how cellular manufacturing represents a
flexible manufacturing system. (Points : 25)
- (TCO 11) State the four building blocks of lean operations, and
explain how fast and simple are the two common threads that run through
them. (Points : 25)
- (TCO 9) Elaborate on the statement: “The output of the system
cannot exceed the output of the bottleneck operation(s).” (Points : 25)
- (TCO 4) Differentiate between infinite loading and finite
loading as two major approaches used to load work centers. (Points : 25)
- (TCO 12) The theory of constraints has a goal of maximizing flow
through the entire system. (Points : 25)
- (TCO 2) Refer to the following data for jobs waiting to be
processed at a single work center (jobs are shown in order of arrival):
- (TCO 10) Respond to the question: “Which is better, MRP or JIT?”
(Points : 25)
- (TCO 1) The design of the MPC system is influenced by some key
features of market demand and product design. Name the key features that
will lead to an assemble-to-order system and explain the rationale.
(Points : 25)
- (TCO 6) Market requirements drive the choice of the shop floor
system approach. Describe and explain the type of market requirements that
would be suitable for an MRP-based system, along the lines of product
design, product variety, product volume per period, product mix changes,
and delivery schedule changes. (Points : 25)
- (TCO 10) Manufacturing strategy also drives the choice of shop
floor system. Describe and explain the strategies that lend themselves to
a JIT-based system, from the perspective of WIP, changeover cost, and
process choice. (Points : 25)
BSOP 429 Week 8 Final
Exam – Set 2
- (TCO 4) The two different approaches to load work centers in
job-shop scheduling are (Points : 5)
- (TCO 2) The priority rule where jobs are processed according to
the smallest ratio of due date to processing time is (Points : 5)
- (TCO 2) A scheduling rule used for sequencing jobs through two
work centers is (Points : 5)
- (TCO 3) The owner and operator of the local franchise of
Handyman, Inc., has four jobs to do today, shown in the order they were
received:………………….If he uses the first-come, first-served (FCFS) priority
rule to schedule these jobs, what will be the average completion time?
(Points : 5)
- (TCO 5) The ultimate goal of JIT operations is to have (Points
: 5)
- (TCO 6) Building up an inventory of standard parts or modules
instead of immediately producing the finished end items is the essence of
(Points : 5)
- (TCO 7) A kanban card is used to signal that (Points : 5)
- (TCO 10) The type of processing system that is used for highly
standardized products is (Points : 5)
Page 2
- (TCO 8) Does cellular manufacturing apply best to repetitive,
high-volume product or nonrepetitive, low-volume product? Explain and give
an example. (Points : 25)
- (TCO 11) Validate or invalidate the statement that although
inventories are maintained, the goal of lean operations is to maintain a
minimum of safety stock. (Points : 25)
- (TCO 9) Elaborate on the statement: “The output of the system
cannot exceed the output of the bottleneck operation(s).” (Points : 25)
- (TCO 4) Differentiate between infinite loading and finite
loading as two major approaches used to load work centers. (Points : 25)
- (TCO 12) Explain why batch process helps maximize worker
efficiency. (Points : 25)
- (TCO 2) Refer to the following data for jobs waiting to be
processed at a single work center (jobs are shown in order of
arrival):………………………… Batch job requires specialized operations carried out
by different workers or group of workers and so there is a need for more
specialization and standardization. What is the schedule sequence using
the first-come, first-served (FCFS) priority rule? (Points : 25)
- (TCO 10) Respond to the question: “Which is better, MRP or JIT?”
(Points : 25)
- (TCO 1) The design of the MPC system is influenced by some key
features of market demand and product design. Name the key features that
will lead to a make-to-stock system and explain the rationale.(Points: 25)
- (TCO 6) Market requirements drive the choice of the shop floor
system approach. Describe and explain the type of market requirements that
would be suitable for an MRP-based system, along the lines of product
design, product variety, and product volume per period, product mix
changes, and delivery schedule changes. (Points : 25)
- (TCO 10) Manufacturing strategy also drives the choice of shop
floor system. Describe and explain the strategies that lend themselves to
a JIT-based system, from the perspective of WIP, changeover cost, and
process choice. (Points : 25)
Comments
Post a Comment